Pre-Construction

Pre- Construction Anti Termite Treatment as per AIM Pest Control Specification

    The principal of the treatment is to create a chemical barrier below and around the building so as to deny entry to the termites into the buildings.


Treatment for without basement Buildings

   The treatment will commence after the foundation and the plinth wall construction is completed.

  1. Treatment to top surface of plinth filling:

    After the soil filling is completed in the plinth area and before the dry rubble packing, the entire surface of the filled soil and the top surface of plinth wall/beam shall be treated with the chemical emulsion at 5 liter per sq.

  2. Treatment at junction of wall and floor:

    Rodding shall be carried out along the junction of wall and soil filling at 1 mtr. Intervals down up to 30 cm. emulsion shall be sprayed along the wall junction at 1 liter pre linear meter so that it mixes thoroughly with the broken-up soil. The disturbed earth is then tamped back in place.

  3. Treatment of soil along external perimeter:

    The soil around the external perimeter of the building up to a depth of 30 cm shall be treated at 2.25 liters per linear meter of the plinth wall.

  4. Treatment of soil surrounding pipes, wastes and conduits:

    When pipes, wastes and conduits enter the soil inside the area of the foundation, the soil surrounding the point of entry must be loosened around each such pipe, waste or conduit for a distance of 15 cm and up to a depth of 7.5cm and loosened soil shall be treated with chemical emulsion.



Treatment for with basement Buildings

The treatment starts when the excavation is complete and before lying soiling and pcc.

  1. Treatment to soil below raft:

    After the soil filling is completed in the plinth area and before the dry rubble packing, the entire surface of the filled soil and the top surface of plinth wall/beam shall be treated with the chemical emulsion at 5 liter per sq.

  2. Treatment to soil along the retaining wall:

    The soil coming in contact with the retaining wall shall be treated at 5 liter per sq. the treatment shall follow the backfilling is done in stages of 30 cms but not exceed a depth of 1 meter.

  3. Treatment to soil along the external perimeter of the building:

    The soil around the external perimeter of the building up to a depth of 30 cm shall be treated at 2.25 liter per linear meter.

  4. Treatment of soil surrounding pipes, wastes and conduits:

    When pipes, wastes and conduits enter the soil inside the area of the foundation, the soil surrounding the point of entry must be loosened around each such pipe, waste or conduit for a distance of 15 cm and up to a depth of 7.5 cm and loosened soil shall be treated with chemical emulsion.